PowerStudyIQ.ELECTRICAL INTELLIGENCE
Scan. See current data. Update once.

Live arc flash labels your team can scan.
From the panel. From the desk. From any phone.

PowerStudyIQ is the electrical equipment platform for industrial facilities. QR-driven field access, NFPA 70E-compliant arc flash labels, isolation paths, and demand cost intelligence in one system of record.

The compliance question
!DANGER!EXTREME ARC FLASH AND SHOCK RISK · APPROPRIATE PPE REQUIREDAny changes in equipment settings will invalidate calculated values.FLASH PROTECTIONFlash Hazard at:1' 6"Min. Arc Rating:87.07 cal/cm²Arc Flash Boundary:5' 8"Glove Class:00Study Date:7/2025SHOCK PROTECTIONShock Hazard when cover is removed:480 VLimited Approach:3' 6"Restricted Approach:1' 0"BUSSG-1 MAINPROTUtilityLOCATIONSwitchgear Room ASCAN FORLIVE DATA
Isolation PathFull upstream chain to de-energize this equipment.⚡ Utility FeedUTILITY #4502118Meter: EM-2104SG-1 MAIN480V📍 Switchgear Room ASG-1 CB 1-1MCC-3480V📍 Production Floor BMCC-3 CB 3-4PP-2A480V📍 Mixing Line 4PP-2A CBDP-12208V📍 Mixing Pump DriveSELECTED DEVICE3 isolation devices upstream. Click any device to navigate.
The Difference

Most QR label tools host one static page per sticker.
PowerStudyIQ is a live electrical equipment database where the QR is one of many ways your team accesses the same data.

Built for Industrial Facilities

One database. Many ways to use it.

Your arc flash hazard analysis and one-line drawings come alive in an interactive platform your team can use on the plant floor or from the desk. Supports the documentation requirements of NFPA 70E 130.5(H).

QR Field Access

Print and mount QR codes on every electrical panel, switchgear, MCC, and distribution panel. Technicians scan from any phone and instantly see arc flash data, isolation paths, and equipment specs. Update once in the platform, every QR shows the new data.

NFPA 70E Arc Flash Labels

NFPA 70E-compliant labels with incident energy, arc flash boundary, glove class, and shock approach distances. Updates automatically when your arc flash study changes. No more outdated stickers, no reprint cycles.

Interactive Isolation Paths

Click any device and see the upstream isolation path as recorded in your equipment database — an informational aid for planning and documenting isolation steps, not a procedure. Field verification by a qualified person is required before any work; this view does not constitute an energy control procedure under 29 CFR 1910.147.

Built around the standards your team already follows

NFPA 70E (2024)NFPA 70 (NEC)IEEE 1584

Still reprinting labels after every study?

Built for industrial facilities. Managing live label data at an operating industrial facility. We work directly from your existing arc flash study and equipment list to show you exactly what this looks like for your team.

The compliance question